Privet palace automation?
Objectives:
Automation for the daily working sub-systems of the palace to save power and stop human-based operation for the vital systems.
Project brief
It is required to automate the following systems to work independently at specific time schedule:
The outdoor lighting system
The irrigation system
- The front sun shading curtain
Outdoor lighting system
It is required to turn the outdoor lighting for the garden fence, roads, and the front side of building during the night time and turned off automatically at the daylight time.
The irrigation system for the garden
It is required to start the irrigation system at 7 am and 5 pm every day in summer and once in winter time for all green areas for two different period of time
The front sun shading curtain
This curtain should work once the front side of reception area exposed directly to the sun light and will be released automatically when sun light moved. This will significantly save the power consumption required for the air condition in this area