Privet palace automation?

Objectives:

Automation for the daily working sub-systems of the palace to save power and stop human-based operation for the vital systems.

Project brief

It is required to automate the following systems to work independently at specific time schedule:

  • The outdoor lighting system

  • The irrigation system

  • The front sun shading curtain

Outdoor lighting system

It is required to turn the outdoor lighting for the garden fence, roads, and the front side of building during the night time and turned off automatically at the daylight time.

The irrigation system for the garden

It is required to start the irrigation system at 7 am and 5 pm every day in summer and once in winter time for all green areas for two different period of time

The front sun shading curtain

This curtain should work once the front side of reception area exposed directly to the sun light and will be released automatically when sun light moved. This will significantly save the power consumption required for the air condition in this area